Metal Ceiling Supports for Baggage Tapes at the Airport
Disassembly, replanting and electromechanical assembly of new luggage carrier system. Manufacture of catwalks and installation of bag racetracks for Ulma Handling.
This was a large-scale work that lasted almost 2 years of construction.
In this work the following main tasks were carried out:
- Disassembly of the old baggage belt system.
- Rethinking and electromechanical mounting of the new conveyor belt carrying system for Ulma Handling.
- Manufacture and assembly of 800 m2 metal catwalk for maintenance of the same.
- Assembly of 4 luggage racetracks.